Skip to content

Industries

Keep the build plan right as parts slip and engineering changes land.

A slipped supplier date or a released engineering change can move the build date before the plan shows it. Zerg AI builds material planning, system connectors and engineering-change workflows for growth-stage launch, satellite and aircraft makers. Each build is tested against the PLM and ERP data and acceptance criteria agreed with you before it touches the build plan.

We build with our own AI platform, which turns requirements into software and uses checks against your real systems to guide each next step.

Who this is for at a launch, satellite or aircraft maker.

  • Supply chain and production control

    Keep the build plan and material needs right when a part or a date moves.

  • Engineering and business systems

    Carry released BOMs and engineering changes from PLM to ERP and the factory.

  • Quality and configuration

    Keep nonconformance, configuration and supplier records ready for an audit.

  • Finance

    Close the books and track cost as production moves from first units to rate.

Three first builds for aerospace teams.

Each first build is a proposal; the consultation settles its scope. It can also start from supplier onboarding and qualification, or quality records tied to part and lot.

  • Material requirements planning

    Today
    Material plans and supplier dates live in spreadsheets beside the ERP, so when a part or a date moves, the build plan finds out late.
    First build
    A planning view over the bill of materials, open orders and supplier dates, with an alert when a date change hits a build.
    Why here
    When a part slips, the build date slips with it unless the plan shows it early.
  • Systems integration and connectors

    Today
    Released BOMs and engineering changes are re-keyed by hand from PLM into the ERP and the factory systems.
    First build
    Connectors from PLM to the ERP and the factory systems, starting with the pair you name, with tests at both ends and an alert when a connector breaks.
    Why here
    Every re-keyed part number is a place a released change can go wrong.
  • Engineering data and change control

    Today
    Part numbers, revisions and engineering changes are tracked across PLM, spreadsheets and email.
    First build
    An engineering change workflow on your PLM, with impact checks, approvals and release status.
    Why here
    A released change that misses the build plan means building the old configuration.

What aerospace teams ask before a first build.

  • Who would see our export-controlled technical data?

    Your export lead decides who may see controlled data. Before any access, we tell you who on our side would need it.

  • Will your work fit our quality system?

    Your quality system stays the record. Your quality head sets what each change must record and who approves it. What we add is the development run record for the changes we build: task, files, checks and execution history, which your process can cite.

  • Could an outside team break the build plan during a ramp?

    You set the tools, execution limits and human review points. We propose ERP writes as a review point in the first build, so the plan changes only after your approver signs off.

The rules that shape the work.

This is our reading of each source. It is not legal advice.

  • EAR deemed export, 15 CFR 734.13

    Your export lead has to know who on an outside team would see technology or source code, before any access: releasing technology or source code (not object code) to a foreign person in the United States is an export to that person’s most recent country of citizenship or permanent residency.

    Source: 15 CFR 734.13, Code of Federal Regulations. As of Nov 14, 2026

  • ITAR deemed export, 22 CFR 120.50

    Your export lead has to know who on an outside team would see technical data, before any access: releasing it to a foreign person in the US is a deemed export, treated as an export to every country where the person has held or holds citizenship or holds permanent residency.

    Source: 22 CFR 120.50, Code of Federal Regulations. As of Nov 14, 2026

Free consultation

Start with one process. We’ll show you what AI can do with it.

In a free consultation we walk through how a supplier date or an engineering change reaches your build plan today. You leave with the first build we would recommend, if one fits.