Industries
Stop re-keying between your ERP, your MES and your quality system.
A lot number, a batch record or a change request typed again from one system into the next is a place a deviation can start. Zerg AI builds system connectors, supply planning and change-control workflows for drug and device manufacturers. Each build is tested against the ERP, MES and quality-system data and acceptance criteria agreed with you before it touches a record.
We build with our own AI platform, which turns requirements into software and uses checks against your real systems to guide each next step.
Who this is for at a drug or device manufacturer.
Supply chain and manufacturing
Keep material needs and the production plan right when a lot, a supplier date or a batch moves.
Quality and regulatory
Keep change, deviation and supplier records ready for an inspection.
IT and business systems
Carry batch, material and test data between the ERP, the MES, the lab system and the quality system.
R&D and device engineering
Port and test firmware and low-level code for new instruments and devices.
Three first builds for life sciences and MedTech teams.
Each first build is a proposal; the consultation settles its scope. It can also start from finance operations automation, or a digital twin of a production plan.
Systems integration and connectors
- Today
- Batch, material and test data is re-keyed by hand between the ERP, the MES, the lab system and the quality system.
- First build
- Connectors between the two systems you name first, with tests at both ends and an alert when a connector breaks.
- Why here
- Every re-keyed lot number is a place a deviation can start.
Material requirements planning
- Today
- Material plans and supplier dates live in spreadsheets beside the ERP, so when a lot or a date moves, the production plan finds out late.
- First build
- A planning view over the bill of materials, open orders and supplier dates, with an alert when a date change hits a batch.
- Why here
- A late raw material holds a batch, and a held batch holds the release.
Change control
- Today
- Change requests, impact assessments and approvals are tracked across the quality system, spreadsheets and email.
- First build
- A change workflow on your quality system or PLM, with impact checks, approvals and release status.
- Why here
- A change that reaches production before its approval is a deviation.
What life sciences and MedTech teams ask before a first build.
We already have an AI team and platform. Where do you fit?
Beside it. Our engineers work inside your team to build workflows, integrations and custom apps, then test them against your real systems. We start with one process your team has not reached.
Will what you build need validation?
Your quality unit decides whether a system is GxP-relevant and what validation it needs. What we add is the acceptance tests and the development run record for the changes we build: task, files, checks and execution history, which your validation can cite.
Who would see batch, patient or design data?
Your quality and privacy leads decide who may see controlled data. Before any access, we tell you who on our side would need it.
The rules that shape the work.
This is our reading of each source. It is not legal advice.
Electronic records and signatures, 21 CFR Part 11
Your quality unit has to decide which records a build creates or changes fall under Part 11, before the build: the rule sets the criteria under which FDA considers electronic records and electronic signatures trustworthy, reliable and generally equivalent to paper records and handwritten signatures.
Source: 21 CFR 11.1(a), Code of Federal Regulations. As of Nov 19, 2026
Computerised systems, EU GMP Annex 11
Your quality unit has to show that replacing a manual step adds no risk: the annex applies to all forms of computerised systems used in GMP-regulated activities, and says that where one replaces a manual operation there should be no resultant decrease in product quality, process control or quality assurance.
Source: EudraLex Volume 4, Annex 11, revision 1, in operation since 30 June 2011. As of Nov 19, 2026
Computer software assurance, FDA guidance
Your quality unit sets how much assurance a tool needs before it is used: FDA’s final guidance covers computer software assurance for production and quality management system software.
Source: Computer Software Assurance for Production and Quality Management System Software, FDA final guidance, February 2026. As of Nov 19, 2026
Security & deployment
Built to run under your rules.
- You set the tools, execution limits and human review points
- Our development runs for the work we build are inspectable: task, files, checks and execution history
- Tests against acceptance criteria agreed with you before the build
- We do not currently hold SOC 2, ISO 27001, or any other third-party security certification. Ask us where the software would run, and what applies to your data, before work starts.
Free consultation
Start with one process. We’ll show you what AI can do with it.
In a free consultation we walk through how a batch, a lot or a change moves between your systems today. You leave with the first build we would recommend, if one fits.